MTB Project Logo

A winding trail that takes you to Harmony Hill.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

2.7

Miles

4.4

KM

Singletrack

520' 159 m

High

209' 64 m

Low

181' 55 m

Up

327' 100 m

Down

4%

Avg Grade (2°)

13%

Max Grade (7°)

Dogs Unknown

E-Bikes Unknown

Description

This is a winding, singletrack trail through the woods, marked with white blazes. It ends on Sawmill Road which will lead you to the covered bridge and back to Harmony Hill.

The trail starts at the old train bed above Harmony Hill, and then winds through the woods with climbs and logs that make it interesting. The trail gets narrow on occasion, and with the steep hill below, it may not be for timid or new riders. After winding through the woods, it passes along the edge of Bradford Elementary School, before continuing through the woods again (come out of the woods, stay to the left and follow the tree line until the singletrack starts again).

After the school, the path follows along a stream and runoff bed, with some fun narrow singletrack above the stream, before dropping you onto Sawmill Road. Sawmill is a dirt road, but cars do occasionally drive it. The trail continues to the left down Sawmill Road, which will put you onto Old Shadyside Rd and 322. A quick dash down the road takes you to the covered bridge, which links you back to Harmony Hill.

Contacts

Shared By:

John Humenick

Trail Ratings

  3.7 from 6 votes

#2

in Downingtown

#20549

Overall
  3.7 from 6 votes
5 Star
17%
4 Star
33%
3 Star
50%
2 Star
0%
1 Star
0%
Trail Rankings

#2

in Downingtown

#678

in Pennsylvania

#20,549

Overall
5 Views Last Month
1,729 Since Jul 30, 2013
Intermediate/Difficult Intermediate/Difficult

0%
20%
20%
0%
60%
0%

Photos

The old covered bridge
Jul 30, 2013 near Downing…, PA

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

Sep 7, 2020
Jack Ansley
Explored the white trail, starting from the covered bridge and looping through the jump trail, up past the school, and back down to the bridge 5.6mi — 1h 01m
Aug 15, 2018
Curtis Hawn
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.