MTB Project Logo

John Muir to Emma Carlin connector trail.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

5.0

Miles

8.0

KM

Singletrack

1,041' 317 m

High

901' 275 m

Low

484' 147 m

Up

397' 121 m

Down

3%

Avg Grade (2°)

28%

Max Grade (16°)

Dogs Unknown

E-Bikes Unknown

Description

Connector - North starts at the northern end of the Bluff Road Two-way Connector above the John Muir Trails. The trail surface varies greatly. From open fields, sandy areas, fast descents, and some rocks, too. Connector - South and Connector - North come together at all road crossings, allowing for bailout if you need to turn back.

Contacts

Shared By:

Matt Block

Trail Ratings

  4.0 from 9 votes

#1

in Whitewater

#10994

Overall
  4.0 from 9 votes
5 Star
22%
4 Star
56%
3 Star
22%
2 Star
0%
1 Star
0%
Trail Rankings

#1

in Whitewater

#241

in Wisconsin

#10,994

Overall
4 Views Last Month
1,054 Since Apr 23, 2014
Intermediate Intermediate

11%
0%
78%
0%
11%
0%

Photos

Scenic overlook at the intersection of the connecting trail to John Muir Loops.
Sep 14, 2017 near Palmyra, WI
Tree down but out of the way.
Jul 20, 2021 near Palmyra, WI

0 Comments

Weather


Current Trail Conditions

All Clear 11 days ago
Add Your Check-In

Check-Ins

Oct 8, 2018
M C
Jun 24, 2018
Jonathan Lippold
12.3mi
Nov 5, 2016
Gavin Creaden
12mi
Jun 27, 2015
Robert Clark
Sep 14, 2014
Dan Kutz
Jul 29, 2013
Lost Justpastnowhere
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.