“An old railroad bed that may eventually be incorporated into the Central Mass Rail Trail. ”
1.8
Miles3.0
KMDoubletrack
Local Club: Blackstone Valley NEMBA
Land Manager: Massachusetts State Parks - Department of Conservation
6.5 mi 10.5 km • 394' Up 120 m Up • 364' Down 111.09 m Down
4.2 mi 6.8 km • 244' Up 74.47 m Up • 244' Down 74.28 m Down
9.4 mi 15.1 km • 773' Up 235.68 m Up • 774' Down 235.93 m Down
23.8 mi 38.3 km • 365' Up 111.4 m Up • 633' Down 193.03 m Down
6.3 mi 10.1 km • 238' Up 72.45 m Up • 238' Down 72.39 m Down
11.1 mi 17.9 km • 839' Up 255.69 m Up • 843' Down 257.06 m Down
0 Comments