MTB Project Logo

A useful connector or bail-out.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

2.3

Miles

3.7

KM

Doubletrack

180' 55 m

High

46' 14 m

Low

270' 82 m

Up

152' 46 m

Down

3%

Avg Grade (2°)

6%

Max Grade (3°)

Dogs Leashed

E-Bikes Unknown

This trail is on an active military installation and is only open to members of the Quantico Mountain Bike Club, except during special events. To learn more about becoming a member, click here.

Description

This doubletrack runs from south to north before bending to the west at the northern end of the trail system. It proves useful for linking trails together or for a quick bail-out if necessary. Trail is not very rideable in some sections due to washout, and steepness.

Contacts

Shared By:

Brian Smith

Trail Ratings

  1.7 from 3 votes

#40378

Overall
  1.7 from 3 votes
5 Star
0%
4 Star
0%
3 Star
0%
2 Star
67%
1 Star
33%
Trail Rankings

#1,015

in Virginia

#40,378

Overall
1 Views Last Month
248 Since Aug 12, 2015
Intermediate Intermediate

33%
0%
33%
0%
33%
0%

Photos

April greenery.
Apr 21, 2024 near Quantic…, VA
Start of Powerline right of way.
Mar 1, 2024 near Quantic…, VA
Over the first crest of Powerline.
Mar 1, 2024 near Quantic…, VA
Rope on >15% grade climb
Mar 1, 2024 near Quantic…, VA
Very muddy, heavily rutted descents.
Mar 1, 2024 near Quantic…, VA
Finally at the top after hiking another unridable climb.
Mar 1, 2024 near Quantic…, VA

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

Mar 1, 2024
Brett Caldwell
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.