MTB Project Logo

An easy track from St. Arnaud Village to the mountain bike track network at Teetotal Conservation Area.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

1.1

Miles

1.7

KM

Singletrack

2,169' 661 m

High

2,042' 623 m

Low

135' 41 m

Up

152' 46 m

Down

5%

Avg Grade (3°)

24%

Max Grade (14°)

Dogs Off-leash

E-Bikes Unknown

Family Friendly Kids can learn to ride some switchbacks and get a nice "remote bush" feel while staying close to the village.

This is a popular multi-use trail. Be alert as you ride and ready to yield appropriately.

Description

Village Link is accessed from Beechnest Drive in St Arnaud. It climbs 98 ft (30 m) in a series of switchbacks to reach conservation land and skirt around private property.

Once the elevation has been gained, the broad gravel track sidles through regenerating native bush before descending in a few more switchbacks down onto grassy flats. The trail emerges at the local ice skating pond and Department of Conservation campground.

Riders can continue on the Skating Pond Loop to head further into the Teetotal trail network.

Contacts

Shared By:

Alan Eskrick

Trail Ratings

  3.0 from 1 vote

#30164

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Trail Rankings

#282

in New Zealand

#30,164

Overall
3 Views Last Month
56 Since Nov 4, 2017
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

Photos

Constructing Village Link
Nov 4, 2017 near St Arnaud, NZ
Starting up St Arnaud end of Village Link
Nov 4, 2017 near St Arnaud, NZ

0 Comments

Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.