MTB Project Logo

Reroute of upper Tramway 723, between FS Road 550 and the Colorado Trail.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

2.2

Miles

3.6

KM

Singletrack

7,672' 2,339 m

High

7,183' 2,189 m

Low

7' 2 m

Up

496' 151 m

Down

4%

Avg Grade (2°)

12%

Max Grade (7°)

Dogs Leashed

E-Bikes Not Allowed

Description

This reroute of upper Tramway 723 was created to eliminate an old steep, rocky road. It lowers the average grade to 3.5%, making it rideable in both directions.

It was machine-made, so berms were created. It includes a nice rock feature, with a few alternate lines, a few with steep rolling drops. Fun and flowy downhill.

It connects to the east end of the Green Mountain Trail and the same lower Tramway. The trail is largely green-blue, with no real technical sections. The old route is closed.

Contacts

Shared By:

Greg Sprenger with improvements by Wendy Sweet and 1 other

Trail Ratings

  4.6 from 7 votes

#7161

Overall
  4.6 from 7 votes
5 Star
71%
4 Star
14%
3 Star
14%
2 Star
0%
1 Star
0%
Trail Rankings

#629

in Colorado

#7,161

Overall
15 Views Last Month
495 Since May 19, 2021
Easy/Intermediate Easy/Intermediate

14%
43%
43%
0%
0%
0%

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

Sep 4, 2024
Matthew Goldatein
Aug 27, 2024
Matthew Goldatein
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.