MTB Project Logo

Chunky technical descent with challenging rock gardens, drops, jumps, and tight sections weaving through trees.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

0.4

Miles

0.6

KM

Singletrack

1,500' 457 m

High

1,343' 409 m

Low

0' 0 m

Up

158' 48 m

Down

8%

Avg Grade (5°)

14%

Max Grade (8°)

Dogs No Dogs

E-Bikes Allowed

Features Drops/Jumps · Views

One Way Only: This is designated as a directional trail.

Need to Know

Starts at the top of the tubing hill, just south of the tube storage building. Features cannot be bypassed. Park at one of the north trailheads off Cty Hwy N. Daily fee or annual pass required. Do not ride muddy trails or during freeze/thaw cycling.

Description

GNARpin is a demanding, advanced trail that starts immediately with a chunky rock garden, setting the tone. Much of the trail is chunky tech, mixed with large berms, jumps, drops, and tight sections that weave between trees.

Construction on this trail was completed in 2023. Rock Solid Trail Contracting spent two weeks on the primary rock feature alone. The masonry throughout is excellent. GNARpin has been compared to Split Rock and Marquette tech.

Contacts

Shared By:

E Bennett

Trail Ratings

  5.0 from 1 vote

#6352

Overall
  5.0 from 1 vote
5 Star
100%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#118

in Wisconsin

#6,352

Overall
0 Views Last Month
0 Since Dec 7, 2023
Intermediate/Difficult Intermediate/Difficult

0%
0%
0%
67%
33%
0%

0 Comments

Weather


Current Trail Conditions

All Clear 97 days ago
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.