MTB Project Logo

Green freeride trail


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

0.9

Miles

1.5

KM

Singletrack

1,779' 542 m

High

1,440' 439 m

Low

79' 24 m

Up

418' 127 m

Down

10%

Avg Grade (6°)

39%

Max Grade (21°)

Dogs No Dogs

E-Bikes Not Allowed

Features -none-

One Way Only: This is designated as a directional trail.

Description

This green freeride trail is packed with the perfect sized features for progressing your riding. Stemming from Mainline, Overhaul winds through the East Basin woods, around Camp III and by Boyle Brook before it reconnects with Mainline. Overhaul features plenty of steady rollers, berms and other features to get you dialed in.

Contacts

Shared By:

Reid Stoppe

Trail Ratings

  3.0 from 1 vote

#34354

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Trail Rankings

#411

in New Hampshire

#34,354

Overall
0 Views Last Month
0 Since May 21, 2024
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.