“A paved multi-use trail (closed to vehicles) connecting the Big Dam Bridge and Two Rivers Bridge ”
1.6
Miles2.5
KMPaved Path
7.7 mi 12.3 km • 388' Up 118.28 m Up • 394' Down 119.98 m Down
8.8 mi 14.2 km • 250' Up 76.28 m Up • 250' Down 76.26 m Down
10.1 mi 16.3 km • 408' Up 124.43 m Up • 408' Down 124.45 m Down
17.4 mi 28.0 km • 544' Up 165.96 m Up • 541' Down 164.97 m Down
10.8 mi 17.3 km • 1,147' Up 349.63 m Up • 1,145' Down 349 m Down
5.0 mi 8.0 km • 49' Up 15.03 m Up • 91' Down 27.62 m Down
0 Comments