MTB Project Logo

A section of trail that showcases some of AF's best features.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

1.3

Miles

2.1

KM

Singletrack

1,014' 309 m

High

997' 304 m

Low

23' 7 m

Up

17' 5 m

Down

1%

Avg Grade (0°)

2%

Max Grade (1°)

Dogs Unknown

E-Bikes Unknown

Description

Built to make use of the south-east and center sections of the AF, the Boundary Trail took the longest to complete. A full 2 seasons of work went into building this flagship trail. Now fully developed, with famous landmarks like Gnome Rock, The Rock Drop, The Rock Point, 2 long rock wall rides, and numerous skinnies and other technical features the Boundary will never leave you disappointed.

Of interest, the original layout was significantly altered after Conservation Halton requested a section be closed skirting a pond, which was a masterpiece of rock work on the cambered edge of the pond including 2 rock bridges across the feeder streams. However, keeping 80% of the original trail open this closure was a small sacrifice in hindsight, but sometimes the little closures sting the most.

Contacts

Shared By:

Trevor Miller

Trail Ratings

  4.0 from 1 vote

#17463

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#101

in Ontario

#17,463

Overall
2 Views Last Month
63 Since Jun 30, 2015
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

Photos

Gnome Rock with the Trilliums in full bloom.
Jun 30, 2015 near Milton, ON
Getting started on Rock Wall!
Jul 5, 2015 near Milton, ON

0 Comments

Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.