MTB Project Logo

Phase 1 of the Keweenaw Point Trail.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

2.8

Miles

4.5

KM

Singletrack

753' 229 m

High

630' 192 m

Low

160' 49 m

Up

193' 59 m

Down

2%

Avg Grade (1°)

10%

Max Grade (6°)

Dogs Unknown

E-Bikes Not Allowed

Description

This trail is the first segment of the Point Trail, which will hopefully extend all the way out to the end of Keweenaw Point. This non-motorized, multi-use path will eventually connect the great trails near Copper Harbor with the end of the Point, allowing cyclists to create loops and routes of varying length.

This section was recently completed and is generally a mellow path. The area has some unique terrain with a conglomerate rock surface in areas. The trail itself is moderately rolling, though grades are gentle. At the east end, there is a very long wooden boardwalk.

The trail is part of the trail system's expansion to the Keweenaw Point. Visit copperharbortrails.org/ for more information on the project.

Contacts

Shared By:

Jeff B. with improvements by Mike Z

Trail Ratings

  4.5 from 10 votes

#6750

Overall
  4.5 from 10 votes
5 Star
60%
4 Star
30%
3 Star
10%
2 Star
0%
1 Star
0%
Trail Rankings

#136

in Michigan

#6,750

Overall
1 Views Last Month
1,750 Since May 27, 2016
Intermediate/Difficult Intermediate/Difficult

0%
0%
64%
18%
18%
0%
loading

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

Jul 15, 2023
Paul Wilson
Jun 26, 2021
Steve Hoover
Nov 4, 2019
Robb Webber
Sep 16, 2019
Keith Wiley
Jun 1, 2019
Darrin Purcell
Sep 15, 2018
ryan Windgassen
Jul 30, 2018
Bryan Kluth
Jun 8, 2018
Rob Raduchel
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.