MTB Project Logo

Connector from main north parking lot through the woods to the main trail core. Great warm-up trail.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

0.4

Miles

0.6

KM

Singletrack

854' 260 m

High

838' 255 m

Low

24' 7 m

Up

16' 5 m

Down

2%

Avg Grade (1°)

6%

Max Grade (3°)

Dogs Leashed

E-Bikes Unknown

Watch for heavy pedestrian traffic on this trail. Especially children as the trail is near the playground.

Description

From the main parking lot, head to the southeast corner and take a quick peek at the trail map to familiarize yourself with our trail systems. From the kiosk, head due east and left around the corner to the wood bridge for a quick warm up through the woods on your way to the main core of trails.

Contacts

Shared By:

Johnny Black

Trail Ratings

  5.0 from 1 vote

#6

in Ewing Park

#3688

Overall
  5.0 from 1 vote
5 Star
100%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#6

in Ewing Park

#27

in Iowa

#3,688

Overall
1 Views Last Month
233 Since Jun 21, 2016
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

Photos

Stepping creek crossing on Trail A
Jun 26, 2016 near Des Moines, IA
Trail A Entry.
Jun 24, 2016 near Des Moines, IA
Table Top on Trail A.
Jun 25, 2016 near Des Moines, IA
Alpha Bet Connector (ABC) creek crossing from Trail C to Trails A and B.
Jun 25, 2016 near Des Moines, IA
Main Parking Lot Kiosk.
Jun 24, 2016 near Des Moines, IA
Trail 1 junction on Trail C.
Jun 25, 2016 near Des Moines, IA

0 Comments

Weather


Current Trail Conditions

All Clear 73 days ago
Add Your Check-In

Check-Ins

Aug 1, 2023
Jeremy Cochran
Sep 19, 2021
Thao Larson
Jul 23, 2020
Justin Carpenter
Aug 10, 2019
Lou Hibbard
c
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.