MTB Project Logo

New trail restoring connectivity between Newhall and Wildwood Open Spaces.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

2.1

Miles

3.3

KM

Singletrack

1,889' 576 m

High

1,584' 483 m

Low

368' 112 m

Up

444' 135 m

Down

7%

Avg Grade (4°)

22%

Max Grade (12°)

Dogs Leashed

E-Bikes Allowed

Description

This trail was recently created to join up the Newhall Open Space entrance on The Old Road to Peach Motorway. Peach Motorway (fire road) was gated off a few years ago due to a lawsuit. This trail connects to the open portion of Peach Motorway which descends into Wildwood Open Space.

The trail can be steep and loose with tight switchbacks and exposure. I rode it up. If I ride it again, I will ride it down. Up is very taxing, even on an eMTB.

Contacts

Shared By:

Kevin Garrett with improvements by Chris Sorensen

Trail Ratings

  3.0 from 4 votes

#25094

Overall
  3.0 from 4 votes
5 Star
25%
4 Star
0%
3 Star
25%
2 Star
50%
1 Star
0%
Trail Rankings

#2,126

in California

#25,094

Overall
3 Views Last Month
496 Since Apr 21, 2019
Intermediate/Difficult Intermediate/Difficult

0%
0%
50%
25%
0%
25%

Photos

The creek crossing. The trail taps into a utility road and then continues on singletrack
Apr 21, 2019 near Santa C…, CA
Towsley in background across the freeway.
Apr 21, 2019 near Santa C…, CA
Part of the lower trail. Some really interesting geology here
Apr 21, 2019 near Santa C…, CA
Easier down than up
Apr 21, 2019 near Santa C…, CA
Switchbacks
Apr 21, 2019 near Santa C…, CA
View looking South towards the 5 & 14 interchange
Apr 21, 2019 near Santa C…, CA
loading

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.