MTB Project Logo

A fast flowy trail that offers multiple route options for your trail pleasure.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

0.4

Miles

0.6

KM

Singletrack

871' 265 m

High

850' 259 m

Low

10' 3 m

Up

25' 8 m

Down

2%

Avg Grade (1°)

3%

Max Grade (2°)

Dogs Leashed

E-Bikes Not Allowed

All local trails take 24-48 hours to dry after a rain. Only ride when frozen in the winter.

Description

This is the URT Connector of the Phase 8 Swope Park Woodchuck Run expansion. The trail connects between the baby head section of Wudchuk Run  Phase 7 and the north end of Wudchuk Run Phase 8.

Contacts

Shared By:

Gregg Rupp

Trail Ratings

  5.0 from 1 vote

#9

in Swope Park

#4137

Overall
  5.0 from 1 vote
5 Star
100%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#9

in Swope Park

#122

in Missouri

#4,137

Overall
1 Views Last Month
70 Since Aug 4, 2020
Easy/Intermediate Easy/Intermediate

0%
100%
0%
0%
0%
0%

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.