MTB Project Logo

More elevation than typical for the Memphis area.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

0.4

Miles

0.6

KM

Singletrack

420' 128 m

High

351' 107 m

Low

92' 28 m

Up

24' 7 m

Down

5%

Avg Grade (3°)

10%

Max Grade (6°)

Dogs Leashed

E-Bikes Allowed

Need to Know

Park at the "Highway 51 Landing" boat ramp, approximately 7 miles south of Hernando, MS.

Description

Area 51 is the newest trail being built by North Mississippi Trail Alliance on US Army Corps of Engineers land at Arkabutla Lake, MS.

Contacts

Shared By:

Bill Heinze

Trail Ratings

  4.0 from 2 votes

#5

in Area 51

#14295

Overall
  4.0 from 2 votes
5 Star
50%
4 Star
0%
3 Star
50%
2 Star
0%
1 Star
0%
Trail Rankings

#5

in Area 51

#52

in Mississippi

#14,295

Overall
1 Views Last Month
50 Since Dec 31, 2020
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

Photos

The start of the trail system.
Dec 9, 2021 near Coldwater, MS

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.